System upgrade, Newbury
- System upgrade Replacing an existing cooling tower – Project value £250,000.00
- Supply of four stainless steel tube ten-meter dry air coolers with a total load of 3000 kW.
- Saving the end user money on ongoing maintenance on the existing cooling tower.
- EC Fans supplied for further energy saving.