System upgrade, Newbury

  • System upgrade Replacing an existing cooling tower – Project value £250,000.00
  • Supply of four stainless steel tube ten-meter dry air coolers with a total load of 3000 kW.
  • Saving the end user money on ongoing maintenance on the existing cooling tower.
  • EC Fans supplied for further energy saving.

Gallery: